By engaging with Solarbear Energies LLP, the Consumer (First Party) and the Vendor (Second Party) agree to the following standard operating terms for Rooftop Solar (RTS) projects under the PM-Surya Ghar: Muft Bijli Yojana:

​

1. Scope of Work

  • Services: Solarbear Energies LLP shall provide design, supply, installation, testing, and commissioning of the RTS system.

    ​

  • Maintenance: A 5-year Comprehensive Maintenance Contract (CMC) is included, covering overhauling, wear and tear, and regular health checks from the date of DISCOM commissioning.

    ​

  • Standards: All modules and inverters must be manufactured in India (DCR compliant) and conform to MNRE/BIS/IEC standards.

    ​

2. Obligations of the Consumer

  • Applications: The consumer is responsible for online applications on the National Portal and net-metering submissions.

  • Site Access & Utilities: The consumer must provide secure storage for materials, roof access, electricity for installation, and water for panel cleaning.​

  • Reporting: Any system malfunctions during the warranty period must be reported promptly to the vendor.

​

3. Obligations of the Vendor

  • Site Survey: Conduct a feasibility study, including roof strength and shadow-free area analysis.

  • Grid Connectivity: The vendor is responsible for net-meter procurement, testing, approvals, and final grid connection.

  • Performance Guarantee: The plant must maintain a Performance Ratio (PR) of 75% at the time of commissioning and throughout the 5-year warranty.

    ​

4. Payment & Financing

  • Standard Schedule:

    • Booking Fee: ₹1,000 (Non-refundable, adjusted against final payment).

    • Advance: 40% of Gross Project Value prior to material procurement.

    • Material Dispatch: 50% upon delivery of equipment to the site.

    • Commissioning: Final 10% upon successful system startup by DISCOM.

  • Financing: Consumers may opt for bank financing through participating PSUs, subject to credit assessment and submission of Aadhaar, PAN, and electricity bills.

    ​

5. Legal & Disputes

  • Force Majeure: Neither party is liable for delays caused by acts of God (floods, earthquakes), war, or government restrictions.

  • Jurisdiction: Unresolved disputes are subject to the exclusive jurisdiction of the Courts at Lucknow, Uttar Pradesh.

 

Grand Holi Offer: Terms & Conditions

Offer Details: Get a flat ₹20,000 discount on the Gross Project Value for 3 kW On-Grid Solar System bookings.

  • Validity: This offer is valid only for bookings made on or before March 10, 2026.

  • Eligibility:

    • Applicable exclusively to 3 kW On-Grid Rooftop Solar projects.

    • Offer is valid only on select brands/models of solar panels and inverters as specified by Solarbear Energies LLP at the time of the site survey.

  • Standard Installation Assumptions:

    • The discounted pricing is based on a standard structure design where the front leg height is 3 feet.

    • Any customization or additional structural requirements (e.g., high-rise structures, specialized walkways, or additional cabling) will be treated as "additional work" and invoiced separately.

  • Application: The ₹20,000 discount will be deducted from the Gross Project Value .

  • Non-Transferable: This offer cannot be clubbed with any other ongoing promotion or referral scheme.